Master closet is complete!

One of the first “difficult tasks” we did for our home renovation back in AUGUST of last year was the frame out the walls for our walk-in master closet. Well it’s been eight long months of living in complete disorganized chaos, but we are FINALLY ready to finish our master closet and put our stuff away. Our clothing has been strewn about our master bedroom in boxes or on temporary hangers since we moved into the house in December. It has not been fun living this way.

IMG_4821.JPG
Behold the hot mess that is currently our master bedroom…our clothing has no where to go!

To finish the walk-in closet, Jeremy started by focusing on the interior walls. He applied compound and then sanded the walls smooth . He is now a super professional and can do drywalling and compounding in his sleep, so this task was pretty easy for him. After Jeremy finished sanding the walls inside the closet (I sealed him and the dust inside), I painted the walls Tundra (the same color as the bedroom).

IMG_4634.JPG

We considered many different closet systems. The problem challenge with our bedroom that we don’t have room for ANY dressers in the room, so we need to fit all of our clothing into the closet, including hanging clothes AND folded/dresser clothing. We needed to find a system that maximized every square inch of available space in the closet, wasn’t too expensive, but also didn’t look or feel too cheap. We looked high and low and finally settled on Home Depot’s ClosetMaid system (due to price and quality).

We bought a few pieces online as a sample and we decided to go for it! It all arrived in the mail and we put it together (it was easier than Ikea furniture but still very time consuming). We anchored the dressers to the walls and put up the brackets and shelving. One of the walls is brick so Jeremy used our heavy duty hammer drill to screw things into that wall.

IMG_4827.JPG
Starting to install the closet system!

After the rest of the items arrived in the mail, Jeremy quickly and expertly installed the remaining shelves and rods while I was at work, and I came home yesterday to this AMAZING master closet!!

There’s space for short and long hanging clothes, plus all of the drawers we will need to replace our dressers. I don’t know if it will fit everything we own, but it’s still so great and exactly what we were hoping for!

 

 

 

Learning as we go in the master bathroom

We passed a sign in our neighborhood for an apprentice school for high-schoolers to learn construction trades and it made me realize these last six months have been one long apprenticeship for both of us. We are constantly learning how to use new tools and are jumping from one trade to the next: demo, electrical, framing, drywalling, painting, etc. etc. etc. And now we are learning the trade we are both most intimidated by: finishing the bathroom. This series of posts will highlight how we are taking the space from this to a master bathroom oasis:

KBZG2130.JPG
Before: the future master bathroom awaits
UXED0421.JPG
We plan to close the left doorway and put the stand up shower there.

This series will also highlight mistakes we made along the way and how we fixed them. 

Before we could do ANYTHING to transform this space, we of course had to demo all the walls and ceiling, which meant a ton more plaster dust, lathe, and insulation to get rid of (not to mention that horrible fake wood paneling). Our friends Julian and Chris came over to help demo because who doesn’t love smashing things to bits?

IMG_4130.JPG
The only photo we have of demo day!
IMG_4131.JPG
Just shoveling some insulation away

Once demo was completed, we were ready to start the project! 

***

Jeremy and I started tackling the master bathroom this weekend. Our general contractor roughed in the plumbing and electrical for us and poured the concrete base for the shower, and left the rest for us to finish. I don’t have a photo of the demo-ed room before we started, but imagine a 9′ x 10′ room with open walls  and ceiling and the original wood floor. 

We are now tasked with finishing the room–which means putting up the ceiling, walls, the floor, installing tile, and putting a vanity with a closet in place.  The tasks that lie before us honestly scare the crap out of me, but we are going to take it one step at a time and see how it goes.

The first step was installing normal drywall on the ceiling, which we did on Saturday. We used our trusty drywall lift which makes ANY ceiling work so much easier. We are drywall experts so this wasn’t too tough.

The next step was preparing the floor for tile. This room had gorgeous, beautiful 100-year old heart pine as the floor. We seriously considered keeping the wood floor but after much debate and research, we decided real wood floors in a master bathroom were just not a great idea. We didn’t want to risk the floor warping from water damage over time, so we made the sad and difficult choice of covering it with tile (to be fair, I did try to sell the planks but no one wanted them). To ensure the tile floor won’t crack over time, we were sure to do the prep work right and not cut any corners….which meant a TON of grueling, back-breaking labor.

Cement board is NOT FUN to work with–it’s waaaaay heavier than drywall and infinitely harder to cut or screw into. I did a lot of complaining this weekend about how much I hate working with it. Here we ran into mistake number 1: we did not have the correct type of blade to cut the cement boards. Always make sure you have the correct tools before you start! With much difficulty, we cut all the pieces we’d need first and “dry fit” them onto the floor to make sure we covered the entire bathroom floor.

IMG_4124.JPG
Dryfitting the cement boards

Then we mixed thinset in a bucket, then I spread it across the floor using a notched trowel.

IMG_4126.JPG
Mixing thinset in a bucket
20190310_141936.jpg
Spreading the thinset across the floor.

We laid down each sheet of cement board and Jeremy screwed it into the floor using a special cement board screw. This is where we encountered another problem–we didn’t have a powerful enough drill so the screw heads would not screw flat into the floor–they popped up ever so slightly. The bumps from each screw will make it difficult to lay down floor tile, so Jeremy ordered a special drill that hammers while it screws (who knew?!) so he will have to go back and push down each damn screw again.

IMG_4129.JPG
Screwing the cement board to the floor below

I used a special kind of tape on the joints between each board, then spread thinset across the seam–all of these steps are required to ensure the subfloor is correctly installed so the tiles on top won’t crack. We have read that lots of people cut corners during this prep phase but come to regret it later when the tiles crack or pop off the floor.

Jeremy also took on the task of screwing the boards onto the wall around the shower. This is where we made our next error. We both completely forgot that we want to install a shower niche to hold shampoo bottles and soap, so we have to remove these three boards and install the niche directly in the middle of this wall. What a waste of time and effort!

InkedIMG_4122_LI 2.jpg

It may not look like a lot was accomplished, but it took two full days to get it to this point, all of which was NO FUN.

IMG_4127.JPG
The cement board floors after one million hours of work
IMG_4125.JPG
The face of proud exhaustion

The next steps will be to install the shower niche, waterproof the entire shower stall with RedGuard, and install the rest of the walls around the room. Then we will take a quick lil break to get married and go on a honeymoon, then return ready to finish this damn room!

Creating a sun-filled oasis, part 1

The bonus room in the rear of our house faces out to the back yard. I envision that one day, the space could be used as a relaxing reading corner with lounging furniture and low book cases, or maybe a sun-filled breakfast nook. For the last few months, it’s looked like a war zone. This is what it looked like the day we bought our home:

IMG_1972.jpg
The bonus room on the day we bought the house

Last fall, we hired a company to remove the load-bearing brick wall to open this space up to the rest of the house. We had the original old windows replaced. Then we demolished the remaining walls and ceiling, ripping out the plaster and lathe to reveal the studs behind the walls. And guess what we found? Two pretty cool brick columns hiding behind some hideous wall paneling.

IMG_3154.JPG
We uncovered the brick columns when we demo-ed the plaster and paneling

We put up sheets of insulation between the studs for temperature control, since these walls are external, and boy, did we feel the cold on the especially windy days in early February! It literally blew into our house before we put up the insulation. Jeremy spent countless hours examining every square inch of this room looking for cold air drafts, and plugging them up with spray foam insulation.

IMG_3825.JPG
Putting insulation in the walls and ceilings made a big difference!

We hired a general contractor to rough in the plumbing and electrical for the powder room (because we are certainly not qualified to install new plumbing and sewage lines). We only paid them to do the framing and behind-the-wall plumbing and electric wiring, then we would “finish” the rooms ourselves to save money.

IMG_3814
The roughed in tiny powder room

The contractor originally made the powder room even smaller than this, which they had to re-do because no human being could comfortably use the toilet. We trusted them to build the room to code but they made it WAY too small. That’s why you should always double check their work and don’t assume they have your needs in mind. TRUST NO CONTRACTOR!

In late January, the entire space was finally ready for us to close it up! The first step was installing drywall. One day when the weather was nice, Home Depot delivered 21 pieces of drywall to our back yard. We knew we needed nice weather on this day because they don’t deliver it inside.

IMG_3830.JPG
The bane of my existence…moving drywall inside

For the next nine straight hours, Jeremy and I were in full-on BEAST MODE. Our goal was to install drywall in our entire bonus room and powder room. This included the ceiling, the beam, and around the windows. I am really proud to report that we are supreme drywall experts at this point, after our drywall adventures over the last six months (read more about it here, here, and here). We honestly kicked ass the entire day. Our approach was simple: measure inside, cut the drywall outside without moving it from where Home Depot dropped it, then walk it inside and install it. Jeremy and I worked in shifts–he measured inside while I cut the drywall outside, then we switched places. It was straight up teamwork MAGIC.

IMG_3835.JPG
After only 8 hours of work, the space was transformed!

At one point I realized I was lifting and moving around our heavy ladder, which I normally can’t lift and make Jeremy move around because I’m a weakling. There was so much adrenaline pumping through my body from the sheer productivity of it all, that I found the strength to get through the day with ease!

We were not able to finish drywalling the entire space, but we got damn close. Jeremy finished installing the remaining pieces over the next few days while I was at work (thanks, boo). Unfortunately since we didn’t finish before the sun set, we had to haul 11 whole pieces of drywall inside. It was NOT my favorite part of the day.

Jeremy insisted he could fit one single piece of drywall into the powder room and he proved me wrong…though it was a tight fit!

IMG_3839.JPG
Just enough space for one man, a light, and a huge piece of drywall

After the drywall was up, it was time to compound! We applied three layers of compound over the screw holes and seams. The most important thing we learned finishing this room is the value of using pre-mixed, 24-hour drying compound as the final topcoat. It is a LIFESAVER and so much easier to sand flat and smooth compared to the 90-minute or 20-minute stuff.

Another miracle tool we discovered is a drywall sanding screen, which is 5,000 times more effective than normal sandpaper.

IMG_4001.JPG
All the seams and screw holes are covered in compound

The next step was dealing with the brick columns. Jeremy caulked the gap between the drywall and the brick, which was way easier than I expected it to be!

IMG_4023.JPG
The gap between the drywall and the brick column looking nice and seamless!

Then we had to seal in the brick columns. The old cement between the bricks was crumbling pretty badly, so we sealed the whole thing with two coats DryLok (meant for waterproofing basement walls). They look so much better already!

Then it was time to prime and paint.

IMG_4034.JPGIMG_4030.JPG

We decided to paint this room a dark color. As I’ve mentioned before, I wanted to paint our entire house rich dark tones, but we ended up compromising on a lot of the rooms. This room has four huge windows with tons of natural light, so I’m sneaking the dark walls into this space.

I will will post a final reveal of the bonus room in a few weeks, after we restore and re-install the window trim, replace the back door, and install the lighting and powder room fixtures!

 

 

 

Building a wall that America actually needs

As I mentioned in this post, our living room was ready to finish once the plumber replaced an old pipe in the wall. So over MLK weekend, our dear friend Elizabeth came over and helped us close in the wall. This was my first foray into compounding which felt super intimidating for some reason.

Walls may just look like walls, but so much work goes into it. To make a wall look like one long, flat surface, you need to hide the seams between each sheet of drywall using tape and compound.  But we didn’t want to pay a handyman to do this type of work so we did it ourselves!

Compound is essentially light weight cement powder that you mix with water and then slather onto the drywall. We used the type that dries in 20 minutes which allows you to apply all three layers of compound in just one day (rather than waiting 90 minutes or 24 hours for other types of compound to dry.

The first step in our journey to finish the wall was to screw drywall into the ceiling to cover the hole the plumber made.

IMG_3683

Then we screwed strips of metal corner bead onto the outside corners, which protect the corner if anything bumps into it.

IMG_3688.JPG
Screwing in the corners

IMG_3677.JPG

Then we got to work compounding over all the seams, screws, and corners. It was not hard at all!

We put tape on the seams by plopping a dollop of compound on the drywall and then gently pushing the drywall/putty knife down along

IMG_3697.JPG
Very proud of my corner

We bought a fun tool to help with the inside seams that worked like a dream! It’s hard to make these inside corners look like crisp 90-degree angles but with my new tool friend, it was super easy!

After two applications of compound, we sanded it down using sanding blocks (which covers everything in a fine compound dust). Then we painted. Then Jeremy cut and installed the baseboard trim and quarter round.

The whole project took about 2 full days to complete, and my god it almost looks like a normal house!!

We built that wall!
We built that wall!

For comparison sake, we would have paid our favorite team of 2 handymen around $1600 to complete this task. I’ll take free over $1600 any day of the week! #Winning.

 

 

 

 

Living room is coming together!

IMG_3600.JPG
Living room almost ready for living! Just need to install baseboards, window trim crown, & finish the entryway white wall 

Our living room is SOOOOO close to being finished, which means we are DAYS away from putting furniture in the room and having a place to sit down!! I feel like a kid the night before Christmas…I’m so excited that I can almost feel those soft sofa cushions under my butt. You see, we have not had anywhere to sit since we purchased the house except for two hard kitchen chairs the previous owner left behind. When we moved in last month, we added three plastic folding chairs to sit at our island, but we still didn’t have anywhere to lounge or relax at the end of the day. We’ve been waiting to bring our living or dining room furniture into the house on a few outstanding, dust-producing tasks to get done.

But it’s a three-day weekend which means WE ARE GOING TO DO ALL THE THINGS!! Now that the plumber has replaced an old pipe we discovered in the front entryway wall and ceiling, we are going to close it up and paint it! Then we will install baseboard trim and re-finish the trim around our entryway door and two front windows.

Jeremy and I are already experts at installing baseboard trim because last weekend we installed a ton of it in our living and dining rooms. We only have a few pieces left to install after we finish the previously mentioned front wall.

How to Install Baseboard Trim

Difficulty level: Easy

Compared to some of the other tasks we’ve done, installing baseboard trim is pretty easy. We had to buy two power tools to get it done, but we think they’ll come in very handy when we tackle the basement renovation later this year.

Step 1: Measure wall

We bought extra long baseboards to ensure a single piece could reach from one side of the room to the other. We didn’t want any seams showing in the baseboard. I keep yelling “million dollar house!” and these details are how we’re gonna get there (I’m partially kidding).  We measured each length of wall that would need a piece of baseboard and accounted for the 45-degree angle cut the saw would make. The goal was to make perfect, 90-degree corners at each inside or outside corner.

IMG_3631.JPG

Step 2: Measure and cut the baseboard

We bought a 10-inch miter saw to cut wood at a 45-degree angle. Unfortunately the blade was not big enough to cut through our 7.5-inch tall baseboards…which we learned the hard way. The saw only cut through about 6 inches of the board and then we manually cut the rest with a tiny baby saw called a coping saw. I wouldn’t recommend this process but we didn’t have any alternative.

IMG_3601.JPG

This step was confusing because we had measured the wall but didn’t know HOW to account for the 45-degree cut at the end. After a bunch of trial and error, we figured out where to cut the boards to create nice looking corners. Not all of our corners are perfect, but hopefully our friends and family won’t be crawling around looking for slight gaps at each corner. Plus, step # 4 mostly made up for this problem

Step 3: Nail the suckers in

We bought an AWESOME new, light-weight nail gun for this project, instead of renting an old, big, heavy one from the hardware store. It is so much easier to use and got the job done so fast. We nailed the baseboards into studs located behind the wall. We were lucky there were studs integrated into the plaster/brick walls, otherwise we’d have to use liquid nails which is a fancy word for super sticky glue, which is a lot more stressful to work with. We used our feet to push the baseboard close to the wall, then nailed those suckers in!

IMG_3634.JPG 20190113_104938.jpg

Step 4: Caulk the seams and edges

To hide any gaps, Jeremy used his trusty caulk gun to caulk the seams and edges along the top and corners of the baseboards. At each corner, he applied caulk BEFORE nailing it in place, to achieve a fully sealed-looking corner. For those corners that did not achieve a perfect 90-degree angle, I applied wood filler in the gaps to manually create the look of a sharp corner.

IMG_3636.JPG

Step 5: Put wood filler in nail holes and any dings, then sand

To make the baseboards look flawless, I crawled around filling all the nail holes and dings with wood filler. Baseboards are not made from solid wood–they’re super light weight so they’re easy to handle but they ding at the slightest touch! The wood filler dries very quickly, then I sanded it flat to create a smooth surface

IMG_3638.JPG
Wood filler in the nail holes, before I sanded it flat

Step 6: Paint, then paint again!

We applied two coats of super white paint in semi-gloss. and BAM, we suddenly have a livable space.

We’ve been sanding the trim around our two windows, and Jeremy is cobbling together a new set of window trim for a window in the back of the house from scraps we saved during demo. I’ll post more on that once it’s done. For now, keep your fingers crossed for a productive weekend that will end in me sitting on a couch!