Learning as we go in the master bathroom

We passed a sign in our neighborhood for an apprentice school for high-schoolers to learn construction trades and it made me realize these last six months have been one long apprenticeship for both of us. We are constantly learning how to use new tools and are jumping from one trade to the next: demo, electrical, framing, drywalling, painting, etc. etc. etc. And now we are learning the trade we are both most intimidated by: finishing the bathroom. This series of posts will highlight how we are taking the space from this to a master bathroom oasis:

KBZG2130.JPG
Before: the future master bathroom awaits
UXED0421.JPG
We plan to close the left doorway and put the stand up shower there.

This series will also highlight mistakes we made along the way and how we fixed them. 

Before we could do ANYTHING to transform this space, we of course had to demo all the walls and ceiling, which meant a ton more plaster dust, lathe, and insulation to get rid of (not to mention that horrible fake wood paneling). Our friends Julian and Chris came over to help demo because who doesn’t love smashing things to bits?

IMG_4130.JPG
The only photo we have of demo day!
IMG_4131.JPG
Just shoveling some insulation away

Once demo was completed, we were ready to start the project! 

***

Jeremy and I started tackling the master bathroom this weekend. Our general contractor roughed in the plumbing and electrical for us and poured the concrete base for the shower, and left the rest for us to finish. I don’t have a photo of the demo-ed room before we started, but imagine a 9′ x 10′ room with open walls  and ceiling and the original wood floor. 

We are now tasked with finishing the room–which means putting up the ceiling, walls, the floor, installing tile, and putting a vanity with a closet in place.  The tasks that lie before us honestly scare the crap out of me, but we are going to take it one step at a time and see how it goes.

The first step was installing normal drywall on the ceiling, which we did on Saturday. We used our trusty drywall lift which makes ANY ceiling work so much easier. We are drywall experts so this wasn’t too tough.

The next step was preparing the floor for tile. This room had gorgeous, beautiful 100-year old heart pine as the floor. We seriously considered keeping the wood floor but after much debate and research, we decided real wood floors in a master bathroom were just not a great idea. We didn’t want to risk the floor warping from water damage over time, so we made the sad and difficult choice of covering it with tile (to be fair, I did try to sell the planks but no one wanted them). To ensure the tile floor won’t crack over time, we were sure to do the prep work right and not cut any corners….which meant a TON of grueling, back-breaking labor.

Cement board is NOT FUN to work with–it’s waaaaay heavier than drywall and infinitely harder to cut or screw into. I did a lot of complaining this weekend about how much I hate working with it. Here we ran into mistake number 1: we did not have the correct type of blade to cut the cement boards. Always make sure you have the correct tools before you start! With much difficulty, we cut all the pieces we’d need first and “dry fit” them onto the floor to make sure we covered the entire bathroom floor.

IMG_4124.JPG
Dryfitting the cement boards

Then we mixed thinset in a bucket, then I spread it across the floor using a notched trowel.

IMG_4126.JPG
Mixing thinset in a bucket
20190310_141936.jpg
Spreading the thinset across the floor.

We laid down each sheet of cement board and Jeremy screwed it into the floor using a special cement board screw. This is where we encountered another problem–we didn’t have a powerful enough drill so the screw heads would not screw flat into the floor–they popped up ever so slightly. The bumps from each screw will make it difficult to lay down floor tile, so Jeremy ordered a special drill that hammers while it screws (who knew?!) so he will have to go back and push down each damn screw again.

IMG_4129.JPG
Screwing the cement board to the floor below

I used a special kind of tape on the joints between each board, then spread thinset across the seam–all of these steps are required to ensure the subfloor is correctly installed so the tiles on top won’t crack. We have read that lots of people cut corners during this prep phase but come to regret it later when the tiles crack or pop off the floor.

Jeremy also took on the task of screwing the boards onto the wall around the shower. This is where we made our next error. We both completely forgot that we want to install a shower niche to hold shampoo bottles and soap, so we have to remove these three boards and install the niche directly in the middle of this wall. What a waste of time and effort!

InkedIMG_4122_LI 2.jpg

It may not look like a lot was accomplished, but it took two full days to get it to this point, all of which was NO FUN.

IMG_4127.JPG
The cement board floors after one million hours of work
IMG_4125.JPG
The face of proud exhaustion

The next steps will be to install the shower niche, waterproof the entire shower stall with RedGuard, and install the rest of the walls around the room. Then we will take a quick lil break to get married and go on a honeymoon, then return ready to finish this damn room!

Creating a sun-filled oasis, part 1

The bonus room in the rear of our house faces out to the back yard. I envision that one day, the space could be used as a relaxing reading corner with lounging furniture and low book cases, or maybe a sun-filled breakfast nook. For the last few months, it’s looked like a war zone. This is what it looked like the day we bought our home:

IMG_1972.jpg
The bonus room on the day we bought the house

Last fall, we hired a company to remove the load-bearing brick wall to open this space up to the rest of the house. We had the original old windows replaced. Then we demolished the remaining walls and ceiling, ripping out the plaster and lathe to reveal the studs behind the walls. And guess what we found? Two pretty cool brick columns hiding behind some hideous wall paneling.

IMG_3154.JPG
We uncovered the brick columns when we demo-ed the plaster and paneling

We put up sheets of insulation between the studs for temperature control, since these walls are external, and boy, did we feel the cold on the especially windy days in early February! It literally blew into our house before we put up the insulation. Jeremy spent countless hours examining every square inch of this room looking for cold air drafts, and plugging them up with spray foam insulation.

IMG_3825.JPG
Putting insulation in the walls and ceilings made a big difference!

We hired a general contractor to rough in the plumbing and electrical for the powder room (because we are certainly not qualified to install new plumbing and sewage lines). We only paid them to do the framing and behind-the-wall plumbing and electric wiring, then we would “finish” the rooms ourselves to save money.

IMG_3814
The roughed in tiny powder room

The contractor originally made the powder room even smaller than this, which they had to re-do because no human being could comfortably use the toilet. We trusted them to build the room to code but they made it WAY too small. That’s why you should always double check their work and don’t assume they have your needs in mind. TRUST NO CONTRACTOR!

In late January, the entire space was finally ready for us to close it up! The first step was installing drywall. One day when the weather was nice, Home Depot delivered 21 pieces of drywall to our back yard. We knew we needed nice weather on this day because they don’t deliver it inside.

IMG_3830.JPG
The bane of my existence…moving drywall inside

For the next nine straight hours, Jeremy and I were in full-on BEAST MODE. Our goal was to install drywall in our entire bonus room and powder room. This included the ceiling, the beam, and around the windows. I am really proud to report that we are supreme drywall experts at this point, after our drywall adventures over the last six months (read more about it here, here, and here). We honestly kicked ass the entire day. Our approach was simple: measure inside, cut the drywall outside without moving it from where Home Depot dropped it, then walk it inside and install it. Jeremy and I worked in shifts–he measured inside while I cut the drywall outside, then we switched places. It was straight up teamwork MAGIC.

IMG_3835.JPG
After only 8 hours of work, the space was transformed!

At one point I realized I was lifting and moving around our heavy ladder, which I normally can’t lift and make Jeremy move around because I’m a weakling. There was so much adrenaline pumping through my body from the sheer productivity of it all, that I found the strength to get through the day with ease!

We were not able to finish drywalling the entire space, but we got damn close. Jeremy finished installing the remaining pieces over the next few days while I was at work (thanks, boo). Unfortunately since we didn’t finish before the sun set, we had to haul 11 whole pieces of drywall inside. It was NOT my favorite part of the day.

Jeremy insisted he could fit one single piece of drywall into the powder room and he proved me wrong…though it was a tight fit!

IMG_3839.JPG
Just enough space for one man, a light, and a huge piece of drywall

After the drywall was up, it was time to compound! We applied three layers of compound over the screw holes and seams. The most important thing we learned finishing this room is the value of using pre-mixed, 24-hour drying compound as the final topcoat. It is a LIFESAVER and so much easier to sand flat and smooth compared to the 90-minute or 20-minute stuff.

Another miracle tool we discovered is a drywall sanding screen, which is 5,000 times more effective than normal sandpaper.

IMG_4001.JPG
All the seams and screw holes are covered in compound

The next step was dealing with the brick columns. Jeremy caulked the gap between the drywall and the brick, which was way easier than I expected it to be!

IMG_4023.JPG
The gap between the drywall and the brick column looking nice and seamless!

Then we had to seal in the brick columns. The old cement between the bricks was crumbling pretty badly, so we sealed the whole thing with two coats DryLok (meant for waterproofing basement walls). They look so much better already!

Then it was time to prime and paint.

IMG_4034.JPGIMG_4030.JPG

We decided to paint this room a dark color. As I’ve mentioned before, I wanted to paint our entire house rich dark tones, but we ended up compromising on a lot of the rooms. This room has four huge windows with tons of natural light, so I’m sneaking the dark walls into this space.

I will will post a final reveal of the bonus room in a few weeks, after we restore and re-install the window trim, replace the back door, and install the lighting and powder room fixtures!

 

 

 

Refreshed from vacation and hyper-productive

It’s been one week since we returned from our fabulous vacation and SO much has happened in the house.

For the first time in a long time, I feel calm and in control of the next few weeks. We know exactly what we need to accomplish between now and December first. The list is long and highly aspirational but at least it lays out our plan.

Meanwhile, last week the DC government came to the house and inspected all the work we’ve done so far and gave us the green light to keep going with our MASTER PLAN! Next week a company is going to remove the load bearing wall that goes the length of our main level. We were told we could save $3-4K if we did all the demo work ourselves—by demo I mean removing all the plaster/lath/drywall on top of the studs in the wall. So dammit, remove it we did! Of course we had tons of incredible and much-needed help from friends (thanks to Julian and Matt for channeling your brute strength to smash through all the walls) and stripped all the walls bare in just two days! Unfortunately, demo produces a LOT of garbage. In just two days, we filled 3 Bagster dumpsters (with a combined capacity of 9,000 pounds)!

 

Our house came with a fake fireplace. We knew it was fake and assumed it was just a thin brick façade. Turns out it was actually a full-sized fireplace made out of genuine (heavy) brick—except it was not connected to the adjacent chimney and therefore completely inoperable. Jeremy destroyed it with a small jack hammer while Matt and I helped him carry them out of the house. Cute enough, a previous owner had installed a fake log with a built-in light bulb (for warmth?). All of this work has helped to expose several square feet of living space that had previously been occupied by a useless pile of bricks.

On Sunday, our friend Lauren came over and helped us think out plans for our kitchen remodel. Always invite your architect friends over on the days you are finalizing plans for a kitchen remodel. She also helped us yank all the nails out of the window and door trim that we want to re-use. After marking on the floor where we envision the new island, we took a field trip the greatest place in the world.

IKEA!

We are designing our kitchen using the frames of Ikea’s kitchen cabinets but covering them with the beautiful doors from SemiHandmadeDoors. Their doors are heavier, thicker, and more customizable than the options at Ikea, but still in the mid-level price range. And lucky for us, Ikea is having their annual kitchen sale in two weeks!

Ikea
Our rough plan for the new open kitchen

I love Ikea. It’s like a playground for adults—with meatballs!!

 

In which we learn the joys of plaster walls

Jeremy and I have made incredible progress on the house since my last update. After two solid weeks of cleaning the place (and feeling like we hardly made a dent) we moved on to a more immediately satisfying activity…knockin’ down some walls ! On HGTV, everyone always goes nuts for demo day and now I understand why. You literally just knock everything over, pull all the nasty stuff off the walls, and hammer to your hearts’ content. While those home improvement shows may have prepared me for the fun of destroying a home that someone once loved, it did NOT properly prepare me for the reality of a home with plaster walls.

Plaster was the building material of choice before drywall was invented. It was the best method for creating walls, but it was incredibly time-consuming and labor intensive to install. You had to frame the room with studs, then nail hundreds of wood laths to the studs, then slather on the fresh plaster mixture. It lends older homes a distinctive character that was lost when drywall was invented.

All I can say is thank GOD they invented drywall, because plaster is a b*tch to remove. We are doing the same process in reverse. And since the plaster has been dry for 100 years, it literally crumbles into dust as we remove it (side note: plaster dust makes for a nice dry shampoo alternative…even though I’m exhausted my hair has never looked better). We prepared for the activity by buying crowbars of varying weights and sizes, and covering the floor with a big construction blanket. Jeremy plopped two plastic bins down on the floor to catch the falling debris and it worked like a charm!

After about 10 hours of smashing the walls to bits and yanking thousands of laths and nails off the studs, our home is coated in a fine layer of dust. BUT we can see the vision of our master suite coming to life. And we feel so accomplished about how much work we got done.

The reason we are doing this insane thing is that we are taking some space from the largest bedroom to build a walk-in closet.  Apparently people didn’t own any clothes 100 years ago because the closets that came with the house are teeny tiny–this is our solution to create storage space. And honestly, it feels so good to punch this house. Jeremy and his friend Harry literally karate kicked one of the walls in, much to their delight. And our friend Sydney showed up to help shovel up the rubble and ideate our dream closet.

We also pulled off the horrible fake wood paneling only to reveal even worse plaster below. We will refinish the walls with drywall in the coming weeks, so anyone who wants to try putting up new walls is welcome to help! We took a class at Home Depot so we are basically experts and can show you how it’s done.

In the meantime, we plan to frame out and build the closet, re-wire some electric outlets and put in recessed lighting in the next few weeks. Oh and did I mention we are getting our HVAC system this week!? No longer will we toil in filth and sweat….only filth! Here’s to smashing our way into week 3 of home ownership!

20180823_183953
Selfies and safety gear