I’m back with part 2 of the bonus room renovation. The last post ended as we were priming the walls. I forgot to mention that Jeremy’s parents came over and helped us to close in the side of the beam facing the kitchen. Judy even screwed in some drywall! Way to go, Judy!
Judy learned to screw in the drywallJudy and jeremy closing in the beam with drywall
Finally we were ready to paint the room! We selected a dark color and I definitely don’t love it. I wanted a dark mauve but its leaning heavily toward purple. I also don’t know how I feel about keeping the brick columns white versus painted. Either way, we don’t really have the time or desire to re-paint this room, so we will leave it this way for now.
Jeremy then sanded down the original window trim and spray painted them with primer. The spray paint version of primer worked well for this task.
Our window trim, sanded smooth and primed
Then our friend David came over and helped us install the window trim. We love any opportunity to use our nail gun, and David expertly nailed those trim pieces into place!
David expertly nails the window trim back into place
Re-installing original window trim isn’t too hard if you are patient and very careful to put the pieces back in the correct order. After nailing them in place, we filled the nail holes and painted them Super White by Benjamin Moore.
Honestly using a nail gun is fun!
Next, Jeremy cut and installed the baseboard trim. Unfortunately we ran out of baseboard trim and are waiting to purchase additional pieces until we need it for other rooms. For now, the space is partially finished and feeling more like a home every day (especially after we removed the floor covering…suddenly it looked like a nice room!)
Removing the floor covering to reveal a nicely finished room!
So here it is….the almost completed sun-filled bonus room! We still need to finish installing the baseboard trim, switch out the light fixture, and MAYBEEEEE repaint the walls, but for now the room has truly transformed!
The bonus room in the rear of our house faces out to the back yard. I envision that one day, the space could be used as a relaxing reading corner with lounging furniture and low book cases, or maybe a sun-filled breakfast nook. For the last few months, it’s looked like a war zone. This is what it looked like the day we bought our home:
The bonus room on the day we bought the house
Last fall, we hired a company to remove the load-bearing brick wall to open this space up to the rest of the house. We had the original old windows replaced. Then we demolished the remaining walls and ceiling, ripping out the plaster and lathe to reveal the studs behind the walls. And guess what we found? Two pretty cool brick columns hiding behind some hideous wall paneling.
We uncovered the brick columns when we demo-ed the plaster and paneling
We put up sheets of insulation between the studs for temperature control, since these walls are external, and boy, did we feel the cold on the especially windy days in early February! It literally blew into our house before we put up the insulation. Jeremy spent countless hours examining every square inch of this room looking for cold air drafts, and plugging them up with spray foam insulation.
Putting insulation in the walls and ceilings made a big difference!
We hired a general contractor to rough in the plumbing and electrical for the powder room (because we are certainly not qualified to install new plumbing and sewage lines). We only paid them to do the framing and behind-the-wall plumbing and electric wiring, then we would “finish” the rooms ourselves to save money.
The roughed in tiny powder room
The contractor originally made the powder room even smaller than this, which they had to re-do because no human being could comfortably use the toilet. We trusted them to build the room to code but they made it WAY too small. That’s why you should always double check their work and don’t assume they have your needs in mind. TRUST NO CONTRACTOR!
In late January, the entire space was finally ready for us to close it up! The first step was installing drywall. One day when the weather was nice, Home Depot delivered 21 pieces of drywall to our back yard. We knew we needed nice weather on this day because they don’t deliver it inside.
The bane of my existence…moving drywall inside
For the next nine straight hours, Jeremy and I were in full-on BEAST MODE. Our goal was to install drywall in our entire bonus room and powder room. This included the ceiling, the beam, and around the windows. I am really proud to report that we are supreme drywall experts at this point, after our drywall adventures over the last six months (read more about it here, here, and here). We honestly kicked ass the entire day. Our approach was simple: measure inside, cut the drywall outside without moving it from where Home Depot dropped it, then walk it inside and install it. Jeremy and I worked in shifts–he measured inside while I cut the drywall outside, then we switched places. It was straight up teamwork MAGIC.
After only 8 hours of work, the space was transformed!
At one point I realized I was lifting and moving around our heavy ladder, which I normally can’t lift and make Jeremy move around because I’m a weakling. There was so much adrenaline pumping through my body from the sheer productivity of it all, that I found the strength to get through the day with ease!
We were not able to finish drywalling the entire space, but we got damn close. Jeremy finished installing the remaining pieces over the next few days while I was at work (thanks, boo). Unfortunately since we didn’t finish before the sun set, we had to haul 11 whole pieces of drywall inside. It was NOT my favorite part of the day.
Jeremy insisted he could fit one single piece of drywall into the powder room and he proved me wrong…though it was a tight fit!
Just enough space for one man, a light, and a huge piece of drywall
After the drywall was up, it was time to compound! We applied three layers of compound over the screw holes and seams. The most important thing we learned finishing this room is the value of using pre-mixed, 24-hour drying compound as the final topcoat. It is a LIFESAVER and so much easier to sand flat and smooth compared to the 90-minute or 20-minute stuff.
Another miracle tool we discovered is a drywall sanding screen, which is 5,000 times more effective than normal sandpaper.
All the seams and screw holes are covered in compound
The next step was dealing with the brick columns. Jeremy caulked the gap between the drywall and the brick, which was way easier than I expected it to be!
The gap between the drywall and the brick column looking nice and seamless!
Then we had to seal in the brick columns. The old cement between the bricks was crumbling pretty badly, so we sealed the whole thing with two coats DryLok (meant for waterproofing basement walls). They look so much better already!
Then it was time to prime and paint.
We decided to paint this room a dark color. As I’ve mentioned before, I wanted to paint our entire house rich dark tones, but we ended up compromising on a lot of the rooms. This room has four huge windows with tons of natural light, so I’m sneaking the dark walls into this space.
I will will post a final reveal of the bonus room in a few weeks, after we restore and re-install the window trim, replace the back door, and install the lighting and powder room fixtures!