My life as a drywall expert

Two months ago, Jeremy and I installed drywall for the first time in two bedrooms. It was a true learning experience, and thankfully now we are able to put that knowledge to use!

The main floor of our house has gone through EXTENSIVE changes in the last month: We removed all the plaster from the walls and demolished the fake chimney, hired a company to remove the load bearing walls and replace with a single column and 3 support beams, had a team of four electricians rip out all the old wiring and install new wiring + recessed lights + light switches + outlets. The main floor is finally ready for us to close in all the open walls, beams, and column.

EATF9626.JPG
We need to close in all the open beams and columns with drywall

IMG_3185.JPG

Last Monday, I got to work measuring the 4 sides of the support column, making sure to cut out square holes for the light switches and outlets. I felt SO proud of myself for getting it correct on the first try! Jeremy installed each side like a pro as I moved on to measuring and cutting the next side, until the entire thing was closed in!

By the end of the day, we had successfully closed in the column and were feeling very proud of ourselves!

IMG_3145.JPG
Successful closing of the column!

The next day we tackled the slightly more complex job of the beams. In no time, the first beam was covered!

IMG_3186.JPG

Successful closing of the beam! Please ignore all the crap around the room.

We are waiting to finish the other beam because the electrician needs to come back tomorrow to fix a tiny problem with a dead light switch. In the meantime, we hired a handyman to compound all the seams closed and the next step (hopefully this weekend!) is to start painting the walls!

3 thoughts on “My life as a drywall expert

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s