Soooo many activities happening in the house right now. We hired our favorite handyman to help out over the weekend because, let’s face it, we move really slow. He helped us add outlets in all the bedroom and change the location of the lighting fixtures on the ceiling. In prep for putting up drywall, we had to carefully pry all the old, beautiful, heavy wood trim off every window and doorframe. We hope to refinish and reuse the original trim because you can’t find that kind of high quality real wood anymore.


Jeremy and his buds and I started putting up drywall. The bedroom already looks so much better. We bought a drywall lift to assist us to hoist up the drywall and it was a lifesaver. This thing costs $130 on Amazon, compared to renting from Home Depot for $45 per day. We know we’ll get a lot of use out of it as we put drywall up in all the bedrooms. We also bought these cute little guys to help us put up vertical drywall on the walls.
Drywall is heavy and awkward to maneuver but the lift helps a lot. No room is perfectly square or rectangular, and our old walls and ceiling aren’t perfectly flat or level. Installing drywall requires lots of patience and measuring to get the piece the exact right size. Plus we need to cut out spaces for light fixtures, ducts, closet openings, etc. The process is slow but we are learning as we go. One painful lesson we learned and and tip I would share with anyone doing their own drywall is to purchase a single sheet and test it in your home before buying 30-50 sheets. We didn’t do this, and learned the hard way that the extra long size we bought was too long to fit up our staircase…now we are stuck with 45 heavy huge pieces of drywall that we must manually cut to downstairs before installing upstairs. I’d also recommend buying less than you think you’ll need because it’s just so big and heavy that disposing of excess when the project is over will be a huge headache.
I’ve also been smoothing out imperfections in the plaster wall in the master bedroom. We’ve decided to keep two of the existing walls as plaster and not cover them with drywall because they’re in pretty good shape and plaster has so much more character. Unfortunately one wall had taken quite the beating so I’ve been filling holes with joint compound.

There have been continual delays in turning on the HVAC system that I won’t go into too much detail on—suffice it to say that our contractors are all annoying in their own special ways. All that’s left is installing two outlets in the attic and then they can turn on the air!
All this demo and construction has produced a ton of debris, and we had been piling up old pieces of wood, trim, bags of plaster, and any other construction garbage in the bonus room/addition on the first floor. We discovered this awesome pop-up construction dumpster at Annie’s Ace Hardware in petworth. For only $130, this company picks up the dumpster from your house and hauls it away. It can hold up to 3,000 pounds! Unfortunately with this hurricane coming toward the east coast it meant I had to load it up in the rain on Sunday, but at least now we have our bonus room back!