We moved! And we started to build a closet!

This week we moved out of our beloved apartment. In order to get a mortgage for our new home, we had to rent out our Columbia Heights apartment starting September 1st. The timing is far from ideal but it’s what we have to work with. So we took a break from fixing up the house to pack up all our stuff and move on Friday. Unfortunately our movers were delayed by many hours and the crew finished moving our stuff at 1 AM on Saturday morning.

We decided the best plan is to move our stuff into the basement of our new house and live a nomadic life for the next few months until the house is in a better condition. Our amazing friends have offered to let us stay with them for a few weeks. We have precisely three weeks until we leave for vacation in Iceland and Germany, so it’s GO TIME!

On Sunday, we went forth and framed a wall! The area that we previously destroyed is being reborn as a larger walk-in closet. After watching some DIY tutorials on youtube (I highly recommend this one from Nils the Carpenter), we rented a nail gun and got to work! It took three power tools and 6 hours, but we managed to remove the existing studs and put up new framing for the closet.

Honestly, it wasn’t too difficult. We framed two simple, straight walls without any obstructions in the way (like pipes or HVAC ducts) so it was a great beginner-level framing project.

I’m realizing as we’ve tackled two major projects so far that everything is going to take longer than we expect, especially at the beginning. We literally wasted an hour trying to make the nail gun function and figure out why the circular saw only cut 3/4 through the stud before inexplicably stopping. As we finally got the hang of things and got into a groove, we were done with the wall!

IMG_2260
Behold our powertool!

We rented a compressor nail gun from Annie’s Ace Hardware in Petworth for 30 bucks. The people who work there are SO helpful and knowledgeable. I’d recommend Ace over Home Depot any day.

On Monday, we ripped out the remaining trim in the bedrooms upstairs and detached the radiators in prep for putting up drywall later this week. Before the drywall goes up, Jeremy plans to install more electric outlets in each room and change up some of the lighting.

 

I’d also like to point out that we still don’t have A/C yet! The process of installing the HVAC and upgrading our electric panel has taken much longer than we expected it to, but hopefully by this Friday we will be able to turn the system on!

One thought on “We moved! And we started to build a closet!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s